



An asphalt pumptrack delivered in 2025 as part of a wider scheme led by the town. Evolving Skatepark worked as joint contractor alongside Atelier Paysager, the lead, across every design stage — concept, scheme design, detailed design and technical design. The track itself was built by Htracks.
| Role | Party |
|---|---|
| Client | Thyez Town Council |
| Project management | Evolving Skatepark |
| Contractors | Htracks |
The first conversation costs nothing and often clears up a great deal.