Evolving Skatepark
Our projects › Ardèche (07)

Lalevade-d'Ardèche (07)

Pumptrack

Client
Lalevade d’Ardeche Town Council
Brief
Pumptrack
Our appointment
Project management, joint contractor
Team
By the Bowl (lead), Evolving Skatepark (joint contractor)
Riding surface
Pumptrack: 610m² of asphalt
Total site area
1200 m²
Cost of works
€126,000 excl. VAT
Design studies
June 2021 to November 2021
Works
June 2022 to July 2022
Delivery
July 2022
Disciplines
Skateboarding, inline, scooter, BMX
Lalevade-d'Ardèche
Lalevade-d'Ardèche — view 2Lalevade-d'Ardèche — view 3Lalevade-d'Ardèche — view 4
The project

Lalevade-d'Ardèche

Project management appointment for a pumptrack. We conceived the Lalevade-d'Ardèche pumptrack to give the village something both inventive and lasting. Its 225 linear metres of track are split across two routes — a blue line round the outside and a red line through the middle — offering rollers, whoops, doubles, tabletops and banked turns for flowing riding and striking transfers. Designed to help riders progress, it takes BMX, mountain bikes, scooters, skates, skateboards and balance bikes. The project turned a former car park into a planted sports site, giving more than 60% of the space back to nature. Beside the river Ardèche, it has become a fixture for the riding community and an example of responsible development.

The project team

Qui a fait quoi

RoleParty
ClientLalevade d’Ardeche Town Council
Project managementBy the Bowl (lead), Evolving Skatepark (joint contractor)
ContractorsE2S Company