Evolving Skatepark
Our projects › Paris (75)

Bercy (EGP12) (75)

Aire acrobatique (freestyle park)

Client
12ᵉ Town Council
Brief
Aire acrobatique (freestyle park)
Our appointment
Project management
Team
Evolving Skatepark
Total site area
900 m²
Cost of works
€320,000 excl. VAT
Whole scheme: €2,500,000 excl. VAT
Delivery
December 2026
Disciplines
Skateboarding, inline, scooter, BMX
Status
Under construction
Skatepark in Bercy (EGP12)
Bercy skatepark (EGP12) — view 2Bercy skatepark (EGP12) — view 3Bercy skatepark (EGP12) — view 4Bercy skatepark (EGP12) — view 5Bercy skatepark (EGP12) — view 6Bercy skatepark (EGP12) — view 7
The project

Skatepark in Bercy (EGP12)

Project management appointment for the refurbishment of the iconic Bercy skatepark, where generations of aggressive-skating and freestyle-scooter champions came of age. We are proud to have designed this new version.

Extensive consultation produced a multi-discipline layout that gives pride of place to learning freestyle sports, while bringing back the distinctive features that made the site's reputation: a mini ramp widened to 10 m, offering up to 12 m of coping and several riding levels, and very long grinding features — a 15-metre rail and an 18-metre ledge.

Although constrained within a slightly smaller footprint than the former skatepark, because of the roof renovation, the layout gained a resi ramp (cushioned jump modules), a jump area and a wall. The whole is arranged as three independent zones to help riders share the space safely: a technical zone, an aerial zone and the mini ramp.

And, as the icing on the cake, to meet a need voiced by the local clubs, two containers have been built into the module structure to store the equipment used for coaching sessions.

An initial scheme at Paris-Seine Bercy — freestyle area, €300,000 excl. VAT — was delivered in 2024.

Opening to the public scheduled for January 2027.

The project team

Qui a fait quoi

RoleParty
Team leadDVVD
ContractorsHoverall
ClientParis 12th arrondissement council
Delegated clientParis Seine
Project management (roof and skatepark)mandataire DVVD architectes ; sous-traitant Evolving Skatepark
Réalisation skateparkHoverall